Hidden single points of failure
Critical components with no qualified alternative — buried under Tier-2 and Tier-3 suppliers you never see.
Connect your BOM to real-time risk analysis. Detect single-source vulnerabilities, tariff exposure and commodity price risk — before they hit your projects.
Built for Norwegian energy, subsea & EPC supply chains
Dashboard
LiveUmbilical Termination Head · Rev C
Overall risk
0 /100
Cost exposure
NOK 0.0M
+4.2% this week
Single-source
0 parts
3 critical
Copper — LME 90d
+34%Critical alerts12
Port congestion: Rotterdam
Lead time +6 days · 2 suppliers
Copper +3.4% today on LME
Cost exposure · 14 line items
Creditsafe score drop: Tier-2 forge
Financial risk · Supplier watch
One intelligence layer over every source that moves your risk
Most procurement teams have never had their BOM, suppliers and the tiers beneath them in one place. By the time a single-source part, a new tariff or a copper spike shows up, the cost is already locked into the project.
Critical components with no qualified alternative — buried under Tier-2 and Tier-3 suppliers you never see.
A trade ruling on specialty steel or Chinese components re-prices forged parts overnight, with no early warning.
Copper, nickel, Inconel and steel move fast. Margins disappear into raw-material moves you didn't model.
The supplier you contract is rarely where the risk is. Lead-time and force-majeure exposure hides deep in the chain.
Import the BOM, supplier lists and CAD references via Excel/CSV or sync straight from SAP/ERP. We read component, quantity, material and lead time — with a preview-and-confirm step and manual override for anything we can't resolve.
Excel · CSV · SAP syncFour connected modules turn a static BOM into a live model of where cost and risk actually live.
Every component is mapped to its supplier — and the tiers beneath, from EPC prime down to raw material — with single-source risks flagged on sight.
Digital twin — supplier map
Tier 1 → 3 · 34 suppliersYour BOM
UTH Assembly · 142 lines
Forged housing
Tier 1 · NO
HP connectors
Tier 1 · SE
Control module
Tier 1 · NO
Steel forge
Tier 2 · DE
Machining
Tier 2 · NO
PCB assembly
Tier 2 · PL
Seals
Tier 2 · UK
Nickel alloy
Tier 3 · single source
Copper wire
Tier 3 · CL
Single source found · no qualified alternative
Every supplier is scored on financial health through Creditsafe, with geopolitical, tariff and commodity events matched to the exact parts they touch.
Risk register
LiveSanctions update: nickel export controls
Geopolitical · Single-source part affected
Port congestion: Rotterdam
Logistics · Lead time +6 days · 2 suppliers
Copper +3.4% today on LME
Commodity · 14 line items affected
Creditsafe score drop: Tier-2 steel forge
Financial risk · Score 71 → 58 · Supplier watch
Tariff ruling: specialty steel +245%
Trade policy · Forged housing · 3 components
Force majeure declared: seals supplier
Tier 2 · UK · alternative qualified
Break cost down to the line, simulate raw-material, FX and logistics moves, and see your full P10–P90 probability range before you commit.
What-if simulator
Monte-Carlo · 10,000 runsP10 — best case
NOK 0.0M
Expected (P50)
NOK 0.0M
P90 — stress case
NOK 0.0M
A structured geopolitical workflow that turns analysis into a pre-committed response — and lets you rehearse it in Fire-Drill Mode before it's real.
Plausible Futures — scenario planner
Fire-Drill ModeStep 1 / 6
Define the question
Suppllai fuses financial, trade, commodity and geopolitical data onto your BOM — so the risk you see is the risk that's actually yours.
Inputs
Outputs
Composite risk score
Weighted supplier, commodity, geopolitical & FX risk
Monte-Carlo cost model
P10–P90 cost outcome per project
Live critical alerts
Matched to your exact materials & suppliers
Scenario playbooks
Pre-committed responses, ready to fire
A morning read on every project — critical alerts, affected designs and what changed overnight.
Daily Brief
Friday · 4 projects · 28 suppliers assessed
Deepwater Production Manifold
Gulf of Mexico · NOK 57.5M · 14 suppliers
Subsea Template & Manifold
West Africa · NOK 63.0M · 5 suppliers
250 MVA Power Transformer
Northern Europe · NOK 18.5M · 11 suppliers
Injection Manifold System
North Sea · NOK 42.0M · 5 suppliers
Total projects
0
Cost exposure
NOK 0M
Overall risk
0/100
Every part with no qualified alternative, surfaced and ranked by impact across the whole BOM.
9 parts flagged across 4 projects
One number for total exposure across all projects — broken down on demand.
NOK 0.0M
+4.2% this week
Which supplier, how much variation, and where cost escalates vs. FEED.
vs. FEED baseline
Run nickel restrictions, an oil-price collapse or steel tariffs against cost and risk — before award. Pre-commit the response, then rehearse it in Fire-Drill Mode.
P90 cost impact
+0.0%
Composite risk
69 → 0
Lead time
+0 wks
Engineering, procurement and risk each ask a different question — and each gets the answer from the same live model.
Is my design risky?
See which components carry risk while the design can still change.
Where are my exposures?
Every single-source part and tariff exposure, ranked by impact.
What's our total exposure?
One exposure number across every project — board-ready.
Every answer comes from one live model of your supply chain — the same source of truth for every team.
Bring a BOM. We'll turn it into a live, multi-tier risk and cost model — and walk you through exactly where your exposure sits.